Houghton University and Kinley have built a strong relationship and continue to build their relationship with future projects. Houghton Paine Science building isa design build partnering with CPL phase one of the two phase project is complete.Kinley had ten months to complete the design and achieve building occupancy to complete this project. This project consisted of updating labs, updating ventilation and fumehoods, and updating classrooms, which all gave the science program a face lift.
Houghton University has students from all over the country come to train and study at their Equestrian Center.This project was a design build 37,600 SF state of the art pre-engineered metal building.Equipped with a welcome center, stalls, a classroom, geothermal heating and cooling, and a riding arena. This project was a dream of a former equestrian studies professor and is now a destination for equestrian shows, trainings, and camps.
Hornell City School District was a 13,750 SF natatorium and locker room facility renovation. This project consisted spec work, tile, and hanging clouds for acoustic sound.
The Fillmore Central School project consisted of new turf multi use athletic field, dug outs, cafeteria, locker rooms, and traffic loop renovations.